Each pin is a link to the project page: Tab to move between them, Enter to open one, Esc to close the tooltip. Dark circles group several nearby projects.
Programme
Water for All
Full Schoolbag
Healthy Mothers
Click Youth
Women & Land
Status
Completed
Under way
To fund
To protect children, school positions are rounded to about 10 km. Base map: Natural Earth (public domain).
The project list
16 projects shown out of 16.
Water for AllCompleted2026
Mokolo solar borehole
Mokolo · Far North
The Foundation’s 42nd borehole feeds six standpipes for 1,500 residents. A committee with equal numbers of women and men runs and maintains it.
The borehole has been drilled and the solar pump installed; the pipes to the neighbourhoods remain to be laid. The municipality provides the land and a technical officer.
The assessment shared with the chieftaincy is complete and the borehole site has been approved. Two-thirds of the budget is still missing to start the work.
A borehole and separate latrines for girls and boys for a school of 640 pupils and neighbouring families. The parents’ association will take care of maintenance.
Beneficiaries
1,200 people including 640 pupils
Budget
€17,050 (11,200,000 FCFA)
Local partner
Parents’ association
Location
6.5° N, 14.3° E (approximate position, rounded to about 10 km)
Back to school 2026: 3,000 schoolbags for the East
Batouri · East
Our back-to-school campaign equips 3,000 pupils in Batouri and Bertoua with a complete kit. Distribution takes place in schools, with parents’ associations.
Beneficiaries
3,000 pupils
Budget
€45,000 (29,520,000 FCFA)
Local partner
Parents’ associations
Location
4.4° N, 14.4° E (approximate position, rounded to about 10 km)
A mobile team made up of a midwife and health workers now visits twelve villages every month. It refers high-risk pregnancies to the regional hospital.
Extend mobile antenatal care to an area where the nearest health centre is more than twenty kilometres away. The district provides the staff, the Foundation the vehicle and the kits.
The room is fitted out and the furniture delivered; the refurbished computers are expected at the end of the year. The first office-skills classes are planned for January.
Beneficiaries
500 pupils a year
Budget
€34,000 (22,300,000 FCFA)
Local partner
Partner public secondary school
Location
4.1° N, 9.7° E (approximate position, rounded to about 10 km)
Six cooperatives have been fitted with drip irrigation since March 2025, halving their water use. The first irrigated harvest was sold at the Foumbot market.
A solar drying unit will let 95 women preserve mangoes and pineapples instead of selling them cheaply at the peak of the harvest. The building is built, the dryers are on order.