Automation · Supervision · Energy — Douala · Garoua · Lyon

Plants that keep running. Teams that can breathe.

Automation, SCADA supervision, IIoT and energy for industrial companies in Central Africa and Europe. We design reliable plants and useful data, and we stay reachable day and night, so your operators can focus on the quality of what they make.

  • Engineer reply within 1 business day
  • 24/7 on-call
  • FR / EN

Plant down? 24/7 on-call: +237 6 00 31 24 24

2014founded in Bassa (Douala)

48engineers and technicians

320+projects delivered

9countries served

1,250days without a lost-time accident

Demonstration figures.

We start on the shop floor

What your teams go through

Before talking technology, we listen to what your operator, your on-call technician and your plant manager live through every day.

The line stops and nobody knows why.

Automatic OEE and stop causes shown live.

The PLC is 25 years old and nobody has the spare part.

Migration to current hardware, without a long shutdown.

Figures arrive on paper, a week later.

Live dashboards anyone can read.

Diesel and outages weigh on every month.

Hybrid solar and automatic transfer switches.

Three technicians in orange coveralls and hard hats crossing a vast concrete slab
FIG. 01 — On site, in protective gear: reliability starts with everyone’s safety.

Live control room

See what your operators would see.

A simulated control room, in your browser, nothing to install. Inject a fault and watch alarms, OEE and the process mimic react.

  • Restrained mimic, following ISA-101: colour only appears for an abnormal situation
  • Prioritised, rationalised alarms, following ISA-18.2
  • OEE per shift, with its formula spelled out
  • Pause, speeds, accessible tables and log export
Screenshot of the simulated control room: grey process mimic, alarm list and OEE indicators
FIG. 02 — Control room screenshot (simulated data).

Featured case studies

Measured results at our clients

Clients anonymised at their request. References available on request, with their consent.

See all seven case studies

Method

A five-step method

Every step produces a deliverable you approve. Tests run on a simulator, in your presence, before anything is stopped.

  1. Audit & survey

    Site visit, I/O inventory, risk analysis. Deliverable: audit report.

  2. Design

    Functional analysis, drawings, OT network architecture, test plan. File approved by you.

  3. Build & FAT

    Tests on a simulator in your presence. Deliverable: FAT report.

    FAT
  4. Commissioning & SAT

    Operator training, acceptance report, as-built file.

    SAT
  5. Lifecycle support

    On-call, preventive work, remote monitoring, obsolescence management.

What we write into every contract

Safety and commitments

Days without a lost-time accident

1,250

Counter running since 30 April 2023. Systematic lock-out, work permits, authorisations renewed every 3 years, and a right to stop for everyone: anyone can say “stop” without having to justify it.

Guaranteed response times (Continuity contract)
Douala and Bonabéri4 h
Littoral region (Edéa, Nkongsamba, Kribi)8 h
Around Garoua8 h
Rest of Cameroon24 h
Central Africa48 to 72 h + immediate remote support
Auvergne-Rhône-Alpesremote within 2 business hours, on site within 24 h
  • Reply within 1 business day
    An engineer, not an automatic form.
  • Itemised quotes
    You see what you pay for, package by package.
  • You own the source code
    Commented, handed over at acceptance.
  • French and English documentation
    Readable by all your teams and auditors.
  • Response times in the contract
    No verbal promises.
  • Safety first
    Right to stop for everyone on site.

Technologies we work with

Technologies we master, not partnerships we claim.

  • Siemens TIA Portal
  • S7-1200/1500
  • S7-300/400
  • S5 (migration)
  • Schneider EcoStruxure
  • Modicon M340/M580
  • Rockwell Studio 5000
  • WinCC Unified
  • Ignition
  • AVEVA
  • Node-RED
  • Grafana
  • InfluxDB
  • Modbus RTU/TCP
  • Profibus
  • Profinet
  • EtherNet/IP
  • OPC UA
  • MQTT
  • LoRaWAN
  • 4G LTE-M

Next step

Let’s talk about your plant.

An engineer replies within one business day. And if a plant is down, call the on-call line: someone answers.