Services

From the sensor to the dashboard.

Six complementary areas of expertise, delivered by the same team. For each: what your teams go through, what we deliver, with which technologies and how fast.

01 / 06

PLC automation & control

What your teams go through

Manual sequences, stops caused by a single sensor, a program nobody dares to touch.

What we deliver

Functional analysis, structured and commented programs, cabinets, FAT on a simulator, commissioning, training.

Technologies
TIA Portal · S7-1200/1500 · Unity Pro · Studio 5000 · Profinet · Profibus
Typical lead time
6 to 16 weeks
Do you work on existing PLCs?

Yes. We follow your naming standards and installed hardware, and we document what we find.

Who owns the programs?

You do. Commented sources are handed over at acceptance, with no lock-in clause.

Request a quote for this service

800600PS24 VCPUDI16DI16DO16AI8COM1234
FIG. 01 — Typical PLC cabinet: 1 24 V power supply · 2 CPU · 3 I/O cards · 4 labelled terminal strip. Every wire carries a number from the drawing.

02 / 06

SCADA & HMI

What your teams go through

Screens full of colour, ignored alarms, data lost at every restart.

What we deliver

ISA-101 mimics, rationalised ISA-18.2 alarm database, history, reports, secure remote access.

Technologies
WinCC Unified · Ignition · AVEVA · EcoStruxure · OPC UA · SQL
Typical lead time
4 to 12 weeks
Why grey screens?

Reserving colour for abnormal situations lets you see what matters at a glance: that is the ISA-101 principle.

Can we monitor remotely?

Yes, read-only by default, over VPN with named accounts. Any command requires strong authentication.

Request a quote for this service

Screenshot of our demo control room: grey mimic, prioritised alarms and OEE indicators
FIG. 02 — Our demo control room: grey by default, colour only for an abnormal situation.

03 / 06

IIoT & data

What your teams go through

OEE worked out by hand on Mondays, figures disputed in meetings.

What we deliver

Edge gateways, OPC UA and MQTT collection, automatic OEE, web dashboards, exports.

Technologies
OPC UA · MQTT · Modbus TCP · Node-RED · InfluxDB · Grafana
Typical lead time
3 to 8 weeks
Do we need to replace our machines?

Rarely: a gateway reads your existing PLCs without changing their program.

Where is our data?

On your site or with the host of your choice. It is never resold.

Request a quote for this service

Operator in front of several data screens in a monitoring room
FIG. 03 — Data first: several sources, one single reading.

Typical architecture

Sensors and actuators

Role: measure and act on the process. Hardware: 4–20 mA sensors, valves, drives. Protocols: hard-wired signals, IO-Link. Watch point: calibration and tagging of every point.

PLCs

Role: run sequences and protect. Hardware: S7-1500, Modicon, ControlLogix. Protocols: Profinet, Profibus, EtherNet/IP. Watch point: program backups and access control.

Edge gateway

Role: read PLCs without changing them and keep 30 days of data. Hardware: SAE-EDGE2, DIN rail. Protocols: Modbus, S7, OPC UA client. Watch point: firewall, named accounts, signed updates.

OT network (OPC UA, MQTT)

Role: carry data between the plant and the outside world. Hardware: managed switches, 4G routers. Protocols: OPC UA, MQTT over TLS. Watch point: zones and conduits following IEC 62443 principles.

Supervision and history

Role: show the plant and keep its history. Hardware: redundant or virtualised server. Protocols: OPC UA, SQL. Watch point: read-only by default, strong authentication for any command.

Dashboards

Role: give the plant manager the figures, every morning. Hardware: shop-floor screen, browser. Protocols: HTTPS. Watch point: a single written, shared definition of each indicator.

04 / 06

Industrial electrical

What your teams go through

Cabinets running hot, unexplained trips, missing drawings.

What we deliver

Main boards, control cabinets, drives, transfer switches, thermography, compliance work.

Technologies
IEC 61439 · NF C 15-100 · NF C 18-510 · variateurs · inverseurs
Typical lead time
4 to 12 weeks
Do you work live?

No. Lock-out is systematic; only measurements are taken, by authorised staff.

Do you offer thermography?

Yes, with a report that ranks hot spots by priority.

Request a quote for this service

Blue control console fitted with switches, dials and handsets
FIG. 04 — Tagged, readable console: cabinet work is judged by its order.

05 / 06

Energy: hybrid solar & efficiency

What your teams go through

Diesel, outages and rising bills weigh on every month.

What we deliver

Energy audit, solar-diesel-battery hybrid plants, drives, consumption monitoring.

Technologies
Solaire PV · LiFePO4 · groupes électrogènes · Modbus TCP · compteurs
Typical lead time
8 to 24 weeks
How much diesel can we save?

Often 25 to 45% with a hybrid plant, depending on sunshine and load, after an audit.

And at night?

Batteries and generator are managed automatically: nobody has to step in.

Request a quote for this service

Rows of tilted solar panels on dry ground below hills
FIG. 05 — Panels on dry ground: the sun of the north makes hybrid worthwhile.

Calculator: what does a variable speed drive save?

Affinity laws: on a pump or a fan, cutting speed by 20% roughly halves the power.

Estimated saving per year

9,690,000 FCFA
Energy before
216,000 kWh
Energy after
114,014 kWh
Energy saved
101,986 kWh
Investment
8,100,000 FCFA
Payback
10.0 months

Indicative estimate, valid for centrifugal pumps and fans without high static head. An audit measures your actual case.

06 / 06

Maintenance, retrofit & on-call

What your teams go through

Obsolete PLCs with no spares, night-time breakdowns, technicians alone facing the unknown.

What we deliver

S5 / S7-300 to S7-1500 migration without long shutdowns, preventive work, 24/7 on-call, critical spares, training.

Technologies
S5 → S7-1500 · rétrofit · préventif · astreinte 24/7 · pièces critiques
Typical lead time
annual contract
What is the response time after a breakdown?

4 h in Douala, 8 h in the Littoral region and around Garoua, 24 h elsewhere in Cameroon: written into the Continuity contract.

Do you keep spare parts?

Yes, the stock is agreed with you in the Performance contract.

Request a quote for this service

Gloved hand of a mechanic tightening the rocker arms of a yellow engine
FIG. 06 — The right gesture, with the right tool, at the right time.

Next step

Let’s talk about your plant.

An engineer replies within one business day. And if a plant is down, call the on-call line: someone answers.